Before you finish: radon and ground
Two facts about Huntsville's ground shape any basement project. The Alabama Department of Public Health names 15 counties, Madison and Limestone among them, as having the highest potential for elevated radon. And the Geological Survey of Alabama says many areas of north Alabama are underlain by carbonate rocks such as limestone that dissolve and form caves and sinkholes, with triggers that include drainage problems and excessive rainfall. Both should be dealt with before any drywall goes up.
Step 1: Test for radon
The Alabama Department of Public Health notes that radon levels can differ greatly even between neighboring homes, recommends that all homes be tested, and points to fixing homes at or above 4 pCi/L. Test the lowest lived-in level before you finish it. If mitigation is needed, it is easier and cleaner to install before walls are finished.
Step 2: Solve water and drainage
Look for damp walls, white mineral deposits, musty smells and water near the floor drain. Fix gutters, downspouts and grading first. Because drainage problems are a sinkhole trigger, make sure water is carried well away from the house, not dumped beside the foundation.
Step 3: Permit costs
The City of Huntsville calculates residential building permits other than new houses as the total contracting price times 0.0055. A detailed contract therefore also sets your permit cost. Trade work, such as wiring, plumbing for a bathroom or new ductwork, is permitted by the contractor holding the license for that trade.
Step 4: Licensing
In Alabama, building, remodeling or repairing a residence when the job costs more than $10,000 needs a license from the Home Builders Licensure Board. Most basement finishes are above that. Ask which license your contractor holds and look it up.
Step 5: The order of work
1. Water management and any structural repairs. 2. Radon testing and mitigation. 3. Design, including egress for bedrooms. 4. Permits. 5. Framing with moisture separation from concrete. 6. Rough electrical, plumbing and HVAC. 7. Rough-in inspections. 8. Insulation and drywall. 9. Below-grade-rated flooring, trim and fixtures. 10. Final inspection.
Humidity control
Below-grade rooms in Huntsville's humid summers need dehumidification. Ask whether the HVAC plan will condition the space properly, or whether a dedicated dehumidifier is needed.
Comparing quotes
Ask for line items: drainage or waterproofing, framing, insulation, electrical, plumbing, HVAC, drywall, flooring, egress windows, permits and cleanup.
Records
Keep the radon test results, permits, inspections and warranties together. Radon results are useful when you sell.